{"id":92869,"date":"2023-02-14T08:30:08","date_gmt":"2023-02-14T13:30:08","guid":{"rendered":"https:\/\/www2.westmount.org\/?p=92869"},"modified":"2023-02-15T09:28:23","modified_gmt":"2023-02-15T14:28:23","slug":"message-from-the-mayor-1-3-hillside-project","status":"publish","type":"post","link":"https:\/\/www2.westmount.org\/en\/message-from-the-mayor-1-3-hillside-project\/","title":{"rendered":"Message from the Mayor: 1-3 Hillside project"},"content":{"rendered":"<p>On January 13, 2023, Council voted unanimously in favour of a project to construct a residential building at 1-3 Hillside to replace the old armoury. The project also received a favourable recommendation from the Planning Advisory Committee (PAC).<\/p>\n<p>Although supported by a large part of the community, the project still faces some opposition from a few residents. This opposition could lead to a referendum that could result in the project being abandoned. That perspective may not be to the benefit of the community as it could open the way for a process authorizing another project less in tune with residents\u2019 expectations. Indeed, since the site zoning is residential, if the project is abandoned, another project could take advantage of the zoning by right to build without going through a public consultation process.<\/p>\n<p>The status quo is not an option. Vacant since 2014, the building has been deteriorating and no longer meets building safety standards.<\/p>\n<p>Before accepting this project, Council was particularly demanding with the developers to ensure that it met the community&#8217;s expectations. The current project is therefore the result of a long process as part of a specific construction, alteration or occupancy proposal for an immovable (SCAOPI)<b> <\/b>that began in 2019 (see timeline below). Modifications were made to the initial project to address comments raised by the community. For instance, the fa\u00e7ade of the new building will be moved back a few metres to insert a green area and increase the pedestrian space. The distance from the neighbouring building has also been increased compared to the initial plan.<\/p>\n<p>Evidently, the project includes a construction phase that may inconvenience the neighbourhood. This phase is temporary, and noise mitigation measures are planned. The building will meet green design criteria (LEED) and the project will positively impact the neighbourhood once completed. It will include vegetation (fruit plants, trees, shrubs and grasses) that will attract pollinators and birds. This vegetation will be an urban oasis in the neighbourhood.<\/p>\n<p>The new structure will be built to avoid obstructing the neighbours&#8217; sunlight. The building will be in harmony with the environment and will retain some elements of heritage interest. Studies conducted by the developer have also shown that the building will have a low impact on traffic.<\/p>\n<p>Like the neighbouring building at 11 Hillside, the new building will contribute to the social mix and animation of the area.<\/p>\n<p>To learn more about the project, I invite you to visit <a href=\"https:\/\/www2.westmount.org\/en\/resident-zone\/urban-planning\/scaopi\/#1580246922933-9ec8884e-de3e\" target=\"_blank\" rel=\"noopener\">www2.westmount.org\/scaopi<\/a>.<\/p>\n<p>&nbsp;<\/p>\n<p>Christina M. Smith<br \/>\nMayor of Westmount<\/p>\n<h2><\/h2>\n<h2><span style=\"color: #000000;\">1-3 Hillside SCAOPI &#8211; Timeline<\/span><\/h2>\n<table style=\"height: 1529px;\" width=\"944\">\n<tbody>\n<tr>\n<td style=\"text-align: center;\" width=\"141\"><strong>Date<\/strong><\/td>\n<td style=\"text-align: center;\" width=\"501\"><strong>Steps<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"141\"><span style=\"color: #800000;\">December 17, 2019<\/span><\/td>\n<td width=\"501\"><strong>Opening of the SCAOPI application<br \/>\n<\/strong><em style=\"font-family: inherit; font-size: inherit;\">Project: construction of a new 8 storey residential building<br \/>\n<\/em><a href=\"https:\/\/www2.westmount.org\/wp-content\/uploads\/2023\/02\/capture-decran-le-2023-02-13-a-141609.png\" target=\"_blank\" rel=\"noopener\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-92874 size-thumbnail\" src=\"https:\/\/www2.westmount.org\/wp-content\/uploads\/2023\/02\/capture-decran-le-2023-02-13-a-141609-150x150.png\" alt=\"\" width=\"150\" height=\"150\" srcset=\"https:\/\/www2.westmount.org\/wp-content\/uploads\/2023\/02\/capture-decran-le-2023-02-13-a-141609-150x150.png 150w, https:\/\/www2.westmount.org\/wp-content\/uploads\/2023\/02\/capture-decran-le-2023-02-13-a-141609-45x45.png 45w\" sizes=\"(max-width: 150px) 100vw, 150px\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td width=\"141\"><span style=\"color: #800000;\">February 11, 2020<\/span><\/td>\n<td width=\"501\"><strong style=\"font-family: inherit; font-size: inherit;\">Public presentation of the project<br \/>\n<\/strong><em style=\"font-family: inherit; font-size: inherit;\">Under the SCAOPI by-law 148<\/em><\/td>\n<\/tr>\n<tr>\n<td width=\"141\"><span style=\"color: #800000;\">Spring 2020 to Fall 2020<\/span><\/td>\n<td width=\"501\"><strong>Review of the project by the Planning Advisory Committee<br \/>\n<\/strong><em>Evolution of the project: building height changed from 8 to 5\u00a0 floors<br \/>\n<a href=\"https:\/\/www2.westmount.org\/wp-content\/uploads\/2023\/02\/capture-decran-le-2023-02-13-a-141704.png\" target=\"_blank\" rel=\"noopener\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-92881 size-thumbnail\" src=\"https:\/\/www2.westmount.org\/wp-content\/uploads\/2023\/02\/capture-decran-le-2023-02-13-a-141704-150x150.png\" alt=\"1-3 Hillside (2)\" width=\"150\" height=\"150\" srcset=\"https:\/\/www2.westmount.org\/wp-content\/uploads\/2023\/02\/capture-decran-le-2023-02-13-a-141704-150x150.png 150w, https:\/\/www2.westmount.org\/wp-content\/uploads\/2023\/02\/capture-decran-le-2023-02-13-a-141704-45x45.png 45w\" sizes=\"(max-width: 150px) 100vw, 150px\" \/><\/a><br \/>\n<\/em><\/td>\n<\/tr>\n<tr>\n<td width=\"141\"><span style=\"color: #800000;\">Winter 2020 to Spring 2022<\/span><\/td>\n<td width=\"501\"><strong>S<\/strong><strong style=\"font-family: inherit; font-size: inherit;\">CAOPI application on hold<br \/>\n<\/strong><em style=\"font-family: inherit; font-size: inherit;\">In order to advance the demolition request, which was authorized by the Demolition Committee on February 17, 2022<\/em><\/td>\n<\/tr>\n<tr>\n<td width=\"141\"><span style=\"color: #800000;\">July 14, 2022<\/span><\/td>\n<td width=\"501\"><strong>Presentation to the Planning Advisory Committee<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"141\"><span style=\"color: #800000;\">July 18, 2022<\/span><\/td>\n<td width=\"501\"><strong>A petition entitled &#8220;Petition for a more adequately set back and limited height 1 Hillside construction project&#8221; is tabled at City Council meeting<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"141\"><span style=\"color: #800000;\">October 18, 2022<\/span><\/td>\n<td width=\"501\"><strong>F<\/strong><strong style=\"font-family: inherit; font-size: inherit;\">avorable recommendation of the project to council by the Planning Advisory Committee<br \/>\n<\/strong><em style=\"font-family: inherit; font-size: inherit;\">Project revised since the July version: additional setback of the front and side wall and modification to the garage entrance<\/em><strong style=\"font-family: inherit; font-size: inherit;\"><br \/>\n<\/strong><em><a href=\"https:\/\/www2.westmount.org\/wp-content\/uploads\/2023\/02\/capture-decran-le-2023-02-13-a-141647.png\" target=\"_blank\" rel=\"noopener\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-92883 size-thumbnail\" src=\"https:\/\/www2.westmount.org\/wp-content\/uploads\/2023\/02\/capture-decran-le-2023-02-13-a-141647-150x150.png\" alt=\"1-3 Hillside(3)\" width=\"150\" height=\"150\" srcset=\"https:\/\/www2.westmount.org\/wp-content\/uploads\/2023\/02\/capture-decran-le-2023-02-13-a-141647-150x150.png 150w, https:\/\/www2.westmount.org\/wp-content\/uploads\/2023\/02\/capture-decran-le-2023-02-13-a-141647-45x45.png 45w\" sizes=\"(max-width: 150px) 100vw, 150px\" \/><\/a><br \/>\n<\/em><\/td>\n<\/tr>\n<tr>\n<td width=\"141\"><span style=\"color: #800000;\">November 21, 2022<\/span><\/td>\n<td width=\"501\"><strong>Adoption of the 1st draft resolution by the municipal council<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"141\"><span style=\"color: #800000;\">November 29, 2022<\/span><\/td>\n<td width=\"501\"><strong>Public notice and posting on the building<br \/>\n<\/strong><em>Announcement of a public consultation meeting<\/em><\/td>\n<\/tr>\n<tr>\n<td width=\"141\"><span style=\"color: #800000;\">December 13,\u00a0 2022<\/span><\/td>\n<td width=\"501\"><strong>Public consultation meeting<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"141\"><span style=\"color: #800000;\">January 16, 2023<\/span><\/td>\n<td width=\"501\"><strong>Adoption of the 2nd draft resolution by the municipal council<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"141\"><span style=\"color: #800000;\">January 24, 2023<\/span><\/td>\n<td width=\"501\"><strong>Public notice<br \/>\n<\/strong><em>announcing the possibility of submitting a request to open a register<\/em><\/td>\n<\/tr>\n<tr>\n<td width=\"141\"><span style=\"color: #800000;\"><em>TBA<\/em><\/span><\/td>\n<td width=\"501\"><strong>Opening of a register<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"141\"><span style=\"color: #800000;\"><em>TBA (if required)<\/em><\/span><\/td>\n<td width=\"501\"><strong>Referendum<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"141\"><span style=\"color: #800000;\"><em>TBA (if required)<\/em><\/span><\/td>\n<td width=\"501\"><strong>Adoption of a resolution<\/strong><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"excerpt":{"rendered":"<p>On January 13, 2023, Council voted unanimously in favour of a project to construct a residential building at 1-3 Hillside<\/p>\n","protected":false},"author":64,"featured_media":92882,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6299],"tags":[],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v21.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Message from the Mayor: 1-3 Hillside project - City of Westmount<\/title>\n<meta name=\"robots\" content=\"noindex, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Message from the Mayor: 1-3 Hillside project - City of Westmount\" \/>\n<meta property=\"og:description\" content=\"On January 13, 2023, Council voted unanimously in favour of a project to construct a residential building at 1-3 Hillside\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www2.westmount.org\/en\/message-from-the-mayor-1-3-hillside-project\/\" \/>\n<meta property=\"og:site_name\" content=\"City of Westmount\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/villedewestmount\" \/>\n<meta property=\"article:published_time\" content=\"2023-02-14T13:30:08+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-02-15T14:28:23+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www2.westmount.org\/wp-content\/uploads\/2023\/02\/capture-decran-le-2023-02-13-a-141704.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1140\" \/>\n\t<meta property=\"og:image:height\" content=\"833\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"M R\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@VilleWestmount\" \/>\n<meta name=\"twitter:site\" content=\"@VilleWestmount\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"M R\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www2.westmount.org\/en\/message-from-the-mayor-1-3-hillside-project\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www2.westmount.org\/en\/message-from-the-mayor-1-3-hillside-project\/\"},\"author\":{\"name\":\"M R\",\"@id\":\"https:\/\/www2.westmount.org\/#\/schema\/person\/70e05049475dd2e62f66f0d3bf30401b\"},\"headline\":\"Message from the Mayor: 1-3 Hillside project\",\"datePublished\":\"2023-02-14T13:30:08+00:00\",\"dateModified\":\"2023-02-15T14:28:23+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www2.westmount.org\/en\/message-from-the-mayor-1-3-hillside-project\/\"},\"wordCount\":629,\"publisher\":{\"@id\":\"https:\/\/www2.westmount.org\/#organization\"},\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www2.westmount.org\/en\/message-from-the-mayor-1-3-hillside-project\/\",\"url\":\"https:\/\/www2.westmount.org\/en\/message-from-the-mayor-1-3-hillside-project\/\",\"name\":\"Message from the Mayor: 1-3 Hillside project - City of Westmount\",\"isPartOf\":{\"@id\":\"https:\/\/www2.westmount.org\/#website\"},\"datePublished\":\"2023-02-14T13:30:08+00:00\",\"dateModified\":\"2023-02-15T14:28:23+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www2.westmount.org\/en\/message-from-the-mayor-1-3-hillside-project\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www2.westmount.org\/en\/message-from-the-mayor-1-3-hillside-project\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www2.westmount.org\/en\/message-from-the-mayor-1-3-hillside-project\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Ville de Westmount\",\"item\":\"https:\/\/www2.westmount.org\/en\/?page_id=5346\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Message from the Mayor: 1-3 Hillside project\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www2.westmount.org\/#website\",\"url\":\"https:\/\/www2.westmount.org\/\",\"name\":\"City of Westmount\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/www2.westmount.org\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www2.westmount.org\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www2.westmount.org\/#organization\",\"name\":\"Ville de Westmount\",\"url\":\"https:\/\/www2.westmount.org\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www2.westmount.org\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www2.westmount.org\/wp-content\/uploads\/2014\/12\/Westmount_logo.jpg\",\"contentUrl\":\"https:\/\/www2.westmount.org\/wp-content\/uploads\/2014\/12\/Westmount_logo.jpg\",\"width\":468,\"height\":606,\"caption\":\"Ville de Westmount\"},\"image\":{\"@id\":\"https:\/\/www2.westmount.org\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/villedewestmount\",\"https:\/\/twitter.com\/VilleWestmount\",\"https:\/\/instagram.com\/villewestmountcity\/\",\"https:\/\/www.youtube.com\/user\/WestmountTV\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www2.westmount.org\/#\/schema\/person\/70e05049475dd2e62f66f0d3bf30401b\",\"name\":\"M R\",\"url\":\"https:\/\/www2.westmount.org\/en\/author\/mrutishisha\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Message from the Mayor: 1-3 Hillside project - City of Westmount","robots":{"index":"noindex","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"og_locale":"en_US","og_type":"article","og_title":"Message from the Mayor: 1-3 Hillside project - City of Westmount","og_description":"On January 13, 2023, Council voted unanimously in favour of a project to construct a residential building at 1-3 Hillside","og_url":"https:\/\/www2.westmount.org\/en\/message-from-the-mayor-1-3-hillside-project\/","og_site_name":"City of Westmount","article_publisher":"https:\/\/www.facebook.com\/villedewestmount","article_published_time":"2023-02-14T13:30:08+00:00","article_modified_time":"2023-02-15T14:28:23+00:00","og_image":[{"width":1140,"height":833,"url":"https:\/\/www2.westmount.org\/wp-content\/uploads\/2023\/02\/capture-decran-le-2023-02-13-a-141704.png","type":"image\/png"}],"author":"M R","twitter_card":"summary_large_image","twitter_creator":"@VilleWestmount","twitter_site":"@VilleWestmount","twitter_misc":{"Written by":"M R","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www2.westmount.org\/en\/message-from-the-mayor-1-3-hillside-project\/#article","isPartOf":{"@id":"https:\/\/www2.westmount.org\/en\/message-from-the-mayor-1-3-hillside-project\/"},"author":{"name":"M R","@id":"https:\/\/www2.westmount.org\/#\/schema\/person\/70e05049475dd2e62f66f0d3bf30401b"},"headline":"Message from the Mayor: 1-3 Hillside project","datePublished":"2023-02-14T13:30:08+00:00","dateModified":"2023-02-15T14:28:23+00:00","mainEntityOfPage":{"@id":"https:\/\/www2.westmount.org\/en\/message-from-the-mayor-1-3-hillside-project\/"},"wordCount":629,"publisher":{"@id":"https:\/\/www2.westmount.org\/#organization"},"articleSection":["News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www2.westmount.org\/en\/message-from-the-mayor-1-3-hillside-project\/","url":"https:\/\/www2.westmount.org\/en\/message-from-the-mayor-1-3-hillside-project\/","name":"Message from the Mayor: 1-3 Hillside project - City of Westmount","isPartOf":{"@id":"https:\/\/www2.westmount.org\/#website"},"datePublished":"2023-02-14T13:30:08+00:00","dateModified":"2023-02-15T14:28:23+00:00","breadcrumb":{"@id":"https:\/\/www2.westmount.org\/en\/message-from-the-mayor-1-3-hillside-project\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www2.westmount.org\/en\/message-from-the-mayor-1-3-hillside-project\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www2.westmount.org\/en\/message-from-the-mayor-1-3-hillside-project\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Ville de Westmount","item":"https:\/\/www2.westmount.org\/en\/?page_id=5346"},{"@type":"ListItem","position":2,"name":"Message from the Mayor: 1-3 Hillside project"}]},{"@type":"WebSite","@id":"https:\/\/www2.westmount.org\/#website","url":"https:\/\/www2.westmount.org\/","name":"City of Westmount","description":"","publisher":{"@id":"https:\/\/www2.westmount.org\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www2.westmount.org\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www2.westmount.org\/#organization","name":"Ville de Westmount","url":"https:\/\/www2.westmount.org\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www2.westmount.org\/#\/schema\/logo\/image\/","url":"https:\/\/www2.westmount.org\/wp-content\/uploads\/2014\/12\/Westmount_logo.jpg","contentUrl":"https:\/\/www2.westmount.org\/wp-content\/uploads\/2014\/12\/Westmount_logo.jpg","width":468,"height":606,"caption":"Ville de Westmount"},"image":{"@id":"https:\/\/www2.westmount.org\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/villedewestmount","https:\/\/twitter.com\/VilleWestmount","https:\/\/instagram.com\/villewestmountcity\/","https:\/\/www.youtube.com\/user\/WestmountTV"]},{"@type":"Person","@id":"https:\/\/www2.westmount.org\/#\/schema\/person\/70e05049475dd2e62f66f0d3bf30401b","name":"M R","url":"https:\/\/www2.westmount.org\/en\/author\/mrutishisha\/"}]}},"jetpack_featured_media_url":"https:\/\/www2.westmount.org\/wp-content\/uploads\/2023\/02\/capture-decran-le-2023-02-13-a-141704.png","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/www2.westmount.org\/en\/wp-json\/wp\/v2\/posts\/92869"}],"collection":[{"href":"https:\/\/www2.westmount.org\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www2.westmount.org\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www2.westmount.org\/en\/wp-json\/wp\/v2\/users\/64"}],"replies":[{"embeddable":true,"href":"https:\/\/www2.westmount.org\/en\/wp-json\/wp\/v2\/comments?post=92869"}],"version-history":[{"count":3,"href":"https:\/\/www2.westmount.org\/en\/wp-json\/wp\/v2\/posts\/92869\/revisions"}],"predecessor-version":[{"id":92942,"href":"https:\/\/www2.westmount.org\/en\/wp-json\/wp\/v2\/posts\/92869\/revisions\/92942"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www2.westmount.org\/en\/wp-json\/wp\/v2\/media\/92882"}],"wp:attachment":[{"href":"https:\/\/www2.westmount.org\/en\/wp-json\/wp\/v2\/media?parent=92869"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www2.westmount.org\/en\/wp-json\/wp\/v2\/categories?post=92869"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www2.westmount.org\/en\/wp-json\/wp\/v2\/tags?post=92869"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}