{"id":102317,"date":"2024-05-27T17:58:47","date_gmt":"2024-05-27T21:58:47","guid":{"rendered":"https:\/\/www2.westmount.org\/?p=102317"},"modified":"2024-05-30T18:01:00","modified_gmt":"2024-05-30T22:01:00","slug":"waterworks-in-the-area-of-belmont-crescent-king-george-park-and-murray-ave-murray","status":"publish","type":"post","link":"https:\/\/www2.westmount.org\/en\/waterworks-in-the-area-of-belmont-crescent-king-george-park-and-murray-ave-murray\/","title":{"rendered":"Waterworks in the area of Belmont Crescent, King George Park and Murray Ave. Murray"},"content":{"rendered":"<p><strong>Start of works : <\/strong><br \/>\n27 May 2024<\/p>\n<p><strong>Duration of works : <\/strong><br \/>\napproximately 7 weeks<\/p>\n<p><strong>Work details<br \/>\n<\/strong>The City of Westmount will undertake a water main rehabilitation project on Belmont Crescent, Murray Avenue, North of Montrose, and extend into King George Park. This work is necessary to ensure a reliable water network, a continuous supply of drinking water to the community, and adequate fire protection in the area by rehabilitating ageing infrastructure.<\/p>\n<p><strong>Expected impact of work &#8211; King George Park<br \/>\n<\/strong>Excavation work is required at two (2) punctual areas within King George Park to complete the water main rehabilitation work, as shown in the image below (red squares). The blue line represents the water main that will be rehabilitated. These excavations are limited in size and are for insertion points to allow for the lining of the water main. An excavation through the park will NOT be carried out as part of this project.<\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"https:\/\/www2.westmount.org\/wp-content\/uploads\/2024\/05\/travux-kgp-belmont-cr-murray-27-mai.png\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-102315 size-full\" src=\"https:\/\/www2.westmount.org\/wp-content\/uploads\/2024\/05\/travux-kgp-belmont-cr-murray-27-mai.png\" alt=\"\" width=\"936\" height=\"662\" srcset=\"https:\/\/www2.westmount.org\/wp-content\/uploads\/2024\/05\/travux-kgp-belmont-cr-murray-27-mai.png 936w, https:\/\/www2.westmount.org\/wp-content\/uploads\/2024\/05\/travux-kgp-belmont-cr-murray-27-mai-300x212.png 300w, https:\/\/www2.westmount.org\/wp-content\/uploads\/2024\/05\/travux-kgp-belmont-cr-murray-27-mai-768x543.png 768w\" sizes=\"(max-width: 936px) 100vw, 936px\" \/><\/a><\/p>\n<p><strong>Expected impact of work \u2013 Neighbouring streets<br \/>\n<\/strong>To complete the work, water closures may be required in the project zone and on adjacent streets. Notice of any water interruption will be given 24-48 hours in advance. Roads will be closed to non-local traffic, and detour routes will be provided. Street parking will be removed on Belmont Cr. and Murray Av. North of Montrose for the duration of the project. Access to walkways will be maintained, and vehicular access to driveways\/garages will be maintained wherever possible.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Start of works : 27 May 2024 Duration of works : approximately 7 weeks Work details The City of Westmount<\/p>\n","protected":false},"author":64,"featured_media":93425,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6299,6318],"tags":[],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v21.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Waterworks in the area of Belmont Crescent, King George Park and Murray Ave. Murray - City of Westmount<\/title>\n<meta name=\"robots\" content=\"noindex, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Waterworks in the area of Belmont Crescent, King George Park and Murray Ave. Murray - City of Westmount\" \/>\n<meta property=\"og:description\" content=\"Start of works : 27 May 2024 Duration of works : approximately 7 weeks Work details The City of Westmount\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www2.westmount.org\/en\/waterworks-in-the-area-of-belmont-crescent-king-george-park-and-murray-ave-murray\/\" \/>\n<meta property=\"og:site_name\" content=\"City of Westmount\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/villedewestmount\" \/>\n<meta property=\"article:published_time\" content=\"2024-05-27T21:58:47+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-05-30T22:01:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www2.westmount.org\/wp-content\/uploads\/2023\/03\/roadwork2023.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1000\" \/>\n\t<meta property=\"og:image:height\" content=\"700\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"M R\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@VilleWestmount\" \/>\n<meta name=\"twitter:site\" content=\"@VilleWestmount\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"M R\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www2.westmount.org\/en\/waterworks-in-the-area-of-belmont-crescent-king-george-park-and-murray-ave-murray\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www2.westmount.org\/en\/waterworks-in-the-area-of-belmont-crescent-king-george-park-and-murray-ave-murray\/\"},\"author\":{\"name\":\"M R\",\"@id\":\"https:\/\/www2.westmount.org\/#\/schema\/person\/70e05049475dd2e62f66f0d3bf30401b\"},\"headline\":\"Waterworks in the area of Belmont Crescent, King George Park and Murray Ave. Murray\",\"datePublished\":\"2024-05-27T21:58:47+00:00\",\"dateModified\":\"2024-05-30T22:01:00+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www2.westmount.org\/en\/waterworks-in-the-area-of-belmont-crescent-king-george-park-and-murray-ave-murray\/\"},\"wordCount\":247,\"publisher\":{\"@id\":\"https:\/\/www2.westmount.org\/#organization\"},\"articleSection\":[\"News\",\"Public Works\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www2.westmount.org\/en\/waterworks-in-the-area-of-belmont-crescent-king-george-park-and-murray-ave-murray\/\",\"url\":\"https:\/\/www2.westmount.org\/en\/waterworks-in-the-area-of-belmont-crescent-king-george-park-and-murray-ave-murray\/\",\"name\":\"Waterworks in the area of Belmont Crescent, King George Park and Murray Ave. Murray - City of Westmount\",\"isPartOf\":{\"@id\":\"https:\/\/www2.westmount.org\/#website\"},\"datePublished\":\"2024-05-27T21:58:47+00:00\",\"dateModified\":\"2024-05-30T22:01:00+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www2.westmount.org\/en\/waterworks-in-the-area-of-belmont-crescent-king-george-park-and-murray-ave-murray\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www2.westmount.org\/en\/waterworks-in-the-area-of-belmont-crescent-king-george-park-and-murray-ave-murray\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www2.westmount.org\/en\/waterworks-in-the-area-of-belmont-crescent-king-george-park-and-murray-ave-murray\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Ville de Westmount\",\"item\":\"https:\/\/www2.westmount.org\/en\/?page_id=5346\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Waterworks in the area of Belmont Crescent, King George Park and Murray Ave. Murray\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www2.westmount.org\/#website\",\"url\":\"https:\/\/www2.westmount.org\/\",\"name\":\"City of Westmount\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/www2.westmount.org\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www2.westmount.org\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www2.westmount.org\/#organization\",\"name\":\"Ville de Westmount\",\"url\":\"https:\/\/www2.westmount.org\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www2.westmount.org\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www2.westmount.org\/wp-content\/uploads\/2014\/12\/Westmount_logo.jpg\",\"contentUrl\":\"https:\/\/www2.westmount.org\/wp-content\/uploads\/2014\/12\/Westmount_logo.jpg\",\"width\":468,\"height\":606,\"caption\":\"Ville de Westmount\"},\"image\":{\"@id\":\"https:\/\/www2.westmount.org\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/villedewestmount\",\"https:\/\/twitter.com\/VilleWestmount\",\"https:\/\/instagram.com\/villewestmountcity\/\",\"https:\/\/www.youtube.com\/user\/WestmountTV\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www2.westmount.org\/#\/schema\/person\/70e05049475dd2e62f66f0d3bf30401b\",\"name\":\"M R\",\"url\":\"https:\/\/www2.westmount.org\/en\/author\/mrutishisha\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Waterworks in the area of Belmont Crescent, King George Park and Murray Ave. Murray - City of Westmount","robots":{"index":"noindex","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"og_locale":"en_US","og_type":"article","og_title":"Waterworks in the area of Belmont Crescent, King George Park and Murray Ave. Murray - City of Westmount","og_description":"Start of works : 27 May 2024 Duration of works : approximately 7 weeks Work details The City of Westmount","og_url":"https:\/\/www2.westmount.org\/en\/waterworks-in-the-area-of-belmont-crescent-king-george-park-and-murray-ave-murray\/","og_site_name":"City of Westmount","article_publisher":"https:\/\/www.facebook.com\/villedewestmount","article_published_time":"2024-05-27T21:58:47+00:00","article_modified_time":"2024-05-30T22:01:00+00:00","og_image":[{"width":1000,"height":700,"url":"https:\/\/www2.westmount.org\/wp-content\/uploads\/2023\/03\/roadwork2023.jpg","type":"image\/jpeg"}],"author":"M R","twitter_card":"summary_large_image","twitter_creator":"@VilleWestmount","twitter_site":"@VilleWestmount","twitter_misc":{"Written by":"M R","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www2.westmount.org\/en\/waterworks-in-the-area-of-belmont-crescent-king-george-park-and-murray-ave-murray\/#article","isPartOf":{"@id":"https:\/\/www2.westmount.org\/en\/waterworks-in-the-area-of-belmont-crescent-king-george-park-and-murray-ave-murray\/"},"author":{"name":"M R","@id":"https:\/\/www2.westmount.org\/#\/schema\/person\/70e05049475dd2e62f66f0d3bf30401b"},"headline":"Waterworks in the area of Belmont Crescent, King George Park and Murray Ave. Murray","datePublished":"2024-05-27T21:58:47+00:00","dateModified":"2024-05-30T22:01:00+00:00","mainEntityOfPage":{"@id":"https:\/\/www2.westmount.org\/en\/waterworks-in-the-area-of-belmont-crescent-king-george-park-and-murray-ave-murray\/"},"wordCount":247,"publisher":{"@id":"https:\/\/www2.westmount.org\/#organization"},"articleSection":["News","Public Works"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www2.westmount.org\/en\/waterworks-in-the-area-of-belmont-crescent-king-george-park-and-murray-ave-murray\/","url":"https:\/\/www2.westmount.org\/en\/waterworks-in-the-area-of-belmont-crescent-king-george-park-and-murray-ave-murray\/","name":"Waterworks in the area of Belmont Crescent, King George Park and Murray Ave. Murray - City of Westmount","isPartOf":{"@id":"https:\/\/www2.westmount.org\/#website"},"datePublished":"2024-05-27T21:58:47+00:00","dateModified":"2024-05-30T22:01:00+00:00","breadcrumb":{"@id":"https:\/\/www2.westmount.org\/en\/waterworks-in-the-area-of-belmont-crescent-king-george-park-and-murray-ave-murray\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www2.westmount.org\/en\/waterworks-in-the-area-of-belmont-crescent-king-george-park-and-murray-ave-murray\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www2.westmount.org\/en\/waterworks-in-the-area-of-belmont-crescent-king-george-park-and-murray-ave-murray\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Ville de Westmount","item":"https:\/\/www2.westmount.org\/en\/?page_id=5346"},{"@type":"ListItem","position":2,"name":"Waterworks in the area of Belmont Crescent, King George Park and Murray Ave. Murray"}]},{"@type":"WebSite","@id":"https:\/\/www2.westmount.org\/#website","url":"https:\/\/www2.westmount.org\/","name":"City of Westmount","description":"","publisher":{"@id":"https:\/\/www2.westmount.org\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www2.westmount.org\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www2.westmount.org\/#organization","name":"Ville de Westmount","url":"https:\/\/www2.westmount.org\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www2.westmount.org\/#\/schema\/logo\/image\/","url":"https:\/\/www2.westmount.org\/wp-content\/uploads\/2014\/12\/Westmount_logo.jpg","contentUrl":"https:\/\/www2.westmount.org\/wp-content\/uploads\/2014\/12\/Westmount_logo.jpg","width":468,"height":606,"caption":"Ville de Westmount"},"image":{"@id":"https:\/\/www2.westmount.org\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/villedewestmount","https:\/\/twitter.com\/VilleWestmount","https:\/\/instagram.com\/villewestmountcity\/","https:\/\/www.youtube.com\/user\/WestmountTV"]},{"@type":"Person","@id":"https:\/\/www2.westmount.org\/#\/schema\/person\/70e05049475dd2e62f66f0d3bf30401b","name":"M R","url":"https:\/\/www2.westmount.org\/en\/author\/mrutishisha\/"}]}},"jetpack_featured_media_url":"https:\/\/www2.westmount.org\/wp-content\/uploads\/2023\/03\/roadwork2023.jpg","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/www2.westmount.org\/en\/wp-json\/wp\/v2\/posts\/102317"}],"collection":[{"href":"https:\/\/www2.westmount.org\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www2.westmount.org\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www2.westmount.org\/en\/wp-json\/wp\/v2\/users\/64"}],"replies":[{"embeddable":true,"href":"https:\/\/www2.westmount.org\/en\/wp-json\/wp\/v2\/comments?post=102317"}],"version-history":[{"count":1,"href":"https:\/\/www2.westmount.org\/en\/wp-json\/wp\/v2\/posts\/102317\/revisions"}],"predecessor-version":[{"id":102318,"href":"https:\/\/www2.westmount.org\/en\/wp-json\/wp\/v2\/posts\/102317\/revisions\/102318"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www2.westmount.org\/en\/wp-json\/wp\/v2\/media\/93425"}],"wp:attachment":[{"href":"https:\/\/www2.westmount.org\/en\/wp-json\/wp\/v2\/media?parent=102317"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www2.westmount.org\/en\/wp-json\/wp\/v2\/categories?post=102317"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www2.westmount.org\/en\/wp-json\/wp\/v2\/tags?post=102317"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}